The International Marine Contractors Association (IMCA) issued its monthly Safety Flashes for December, analyzing the case where a man fell overboard.
The incident
A man overboard incident occurred, in port at night. A rigger on the main deck, walking around spools secured to the main deck, stepped off the side of the vessel and fell to the sea.
During mobilization of large spools, the vessel crew had removed a section of the starboard bulwark to accommodate the spools, for they were bigger than the main deck area – the spools extended over the side of the vessel.
Amid sea-fastening of the spools a rigger decided to walk around the outside of the largest spool, without realizing this was over the side of the vessel.
Therefore, the rigger passed through a chain barrier and subsequently stepped over the side of the vessel. The rigger was not observed falling, but his calls for help were heard.
However, he was rescued unharmed through the effective response of his colleagues, using life buoys and the pilot ladder.
Findings:
- No rigid barriers were erected at the time of incident, only a temporary chain barrier, which the rigger passed through.
- Darkness, shadows, light transitions and poor weather (drizzle) made it difficult to see the difference between the deck and the water.
- The rigger had been on board for two weeks (with the bulwarks removed throughout that period due to multiple spool sets being mobilized) and had participated in the toolbox talk before he started work. He still did not understand the full hazard.
- There was no explicit specification that gaps should be barriered off on the starboard side (the task plan did specify a barrier for a similar situation on port side of the vessel).
Lessons learned:
- Verify that all temporary gaps and openings which create a fall hazard are equipped with rigid barriers.
- Never use access control barriers (plastic chain or barrier tape) as the single barrier for fall protection hazards.
- Review appropriateness of the use of access control barriers in particular: Only using these barriers for access control and not for control of fall hazards; Warning signs used with the barrier;Authorization of access and egress from the barriered area.
- Check that back deck lighting is sufficient, with particular reference to areas of deep shadow.
- When project activities involve the removal or disabling of permanent safety equipment on a worksite, such as bulwarks, handrails and fire detectors for example, the project team has a responsibility to plan for an alternative and equally effective means of protection, confirming this with the worksite.