Tag: mooring

Filter By:

Mooring operation heavily injures crew

The Swedish Club issued its December's monthly scenario focusing on a serious injury when during mooring operations the AB threw the heaving line to the line handler, with the monkey fist heavily hitting him on the head; The Club stresses that the mooring operations should always be in line with the instructions from their flag state, port state and ideally what is stated in the COSWP.

Read more

Case study: Mooring line failure onboard

A large LNG carrier was docked in an LNG terminal in UK. The 345.30m LOA carrier was moored with a total number of 20 lines (high modulus polyethylene ropes) following the ‘3-2-3-2 fore and aft’ rule. The vessel had 22 lines on board (as per manufacturer’s requirements) to be used during mooring operations of 44mm diameter Steelite Superline Xtra high modulus polyethylene (HMPE) with a specified minimum breaking load (MBL) of 137t.

Read more
Page 7 of 22 1 6 7 8 22