Grimaldi has commissioned Shanghai Waigaoqiao Shipbuilding Company Limited (SWS) and China Shipbuilding Trading Company Limited (CSTC), to build five new PCTC (Pure Car & Truck Carrier) vessels, with the option for another two units. The ships will have the RINA Ammonia Ready class notation.
With a length of 200 meters, a width of 38 meters and loading capacity of 9,000 CEU (Car Equivalent Unit), the new buildings have been designed to transport electric and fossil fuel vehicles as well as other types of heavy rolling freight (up to 250 tons).
They will be among the first ships equipped with a new type of electronic engine whose specific consumption is one of the lowest in its category. Thanks to their emission abatement systems, the new units will comply with the most stringent limits established at international level for CO2, NOx and SOx emissions.
In addition, the new ships will have the RINA Ammonia Ready class notation, which certifies that they may be converted for the use of ammonia as an alternative, zero-carbon fuel.
They will also be designed for cold ironing with shoreside supply of electricity (where available), which constitutes a green alternative to the consumption of fossil fuels during port stays.
In addition to the significant increase in capacity, thanks to design innovations and state-of-the-art engines and systems, their CO2 emissions per cargo unit transported index will be 27% lower than that of previous generation of ships.
Upon their delivery, expected between 2025 and 2026, the new buildings will enhance the Grimaldi Group’s services between Europe, North Africa, the Near and Far East.
The new order was signed just over two months after the Group’s latest order for the construction of five ammonia-ready PCTC vessels.