Gard Club published an overview of best practices, to reduce risks and prevent losses of accidents related to shore pipeline clearing operations. Over-pressurization or overfilling of tanks can cause physical damage, pollution and even personal injuries.
According to Robert Skaare, Senior Claims Executive, Arendal, over the last few months, Gard has seen a marked increase in incidents related to the clearing of shore pipelines. The causes can vary: over-pressurization of tanks can cause physical damage, and overfilling of tanks can cause spillage, pollution and personal injuries. In Gard, we have seen examples of all this – including several cases of “near misses” over the past few years.
Risks of pigging and line blowing
As explained, the procedures used for clearing shore pipelines will depend on the facilities available at each terminal and the type of cargo loaded. Usually, they involve either line blowing or pigging. Both methods involve transferring large amounts of liquid or gas through the pipelines. Due to the sheer volume being transferred, it is extremely important that this flow is controlled at the manifold with the manifold valve. Moreover, good communication during the entire operation is key to preventing incidents.
Most accidents leading to structural damage to vessel tanks are caused by either too high volume of gas being supplied, too much cargo being pushed into the tank, or that the speed of inflow is too high.
What is line blowing and pigging?
- The purpose of line blowing and pigging is to clear and clean the pipeline as much as possible, to ensure that it is ready for the next operation. This is important to avoid cargo mixture and cargo contamination.
- Clearing of pipelines is done either by line blowing or by pigging. Line blowing involves pushing compressed air or nitrogen through the pipeline to clear it. Pigging involves pushing an object, most often a rubber sphere or cylinder known as a “pig”, through the pipeline by means of a liquid or a compressed gas.
Planning and responsibilities
All cargo operations must be carefully planned and documented well in advance of execution. The details of the plans must be discussed with all personnel, both on the ship and at the terminal. The Master should ensure that everyone involved is properly trained and fully aware of the challenges associated with the pipeline clearing operations. A pre-cargo operation meeting between personnel responsible for the operation from ship and terminal should confirm all critical interface parameters.
Recommendations
In order to minimize risk of over-pressurization:
- Avoid using tanks that are loaded close to 98% as reception tanks for line clearing. Include a safety margin when estimating required ullages for reception tanks to account for potential inaccuracies in the terminal’s declared “pigging quantities”.
- Consider including provisions for a standby cargo tank to be lined up and ready to be opened should the risk of overfill arise.
- Keep manifold valves closed during idle periods. This will prevent accidental over-pressurization due to shore error.
- Ensure that the vapour return line to shore is open during the operation (when available).
- Monitor the manifold pressure closely and throttle the main manifold valve as required. At the start of the pigging operation, the valve should be opened minimally to control the flow and volume of liquid and propellant gas into the nearly full cargo tank. Gard strongly recommends that only properly trained and experienced personnel are assigned duties related to operation of the ship manifold valves.
- Monitor the available amount of cargo tank ullage space and pressure in the tank. If the volume and/or pressure becomes too high, close the manifold valve, and alert the terminal to stop pigging.
- During freezing weather conditions, inspect tank vents (P/V valves) at regular intervals. Some products will freeze and clog the vents thereby creating pressure.
- Close the manifold valves immediately (in agreement with the terminal) once a pig has reached its receiver/trap to avoid compressed propelling gas entering a loaded cargo tank.
- When loading operations are complete, make sure that the manifold valve is fully closed before starting to clear the shoreline.
- Report immediately to the terminal any abnormalities or deviations from normal procedures.