How to prepare a pre-stow plan: Key considerations
When preparing the pre-stow plan, the first thing to do is to check what load line zone/area the ship is in throughout the voyage, and then to calculate the deadweight according to the restricted draught and water density of the (un)loadport or channel, argues Captain Zhao Qingwei, the head of safety supervision department of Chinaland Shipping.
Read moreDetails