PSA Norway: Non-comformities on Equinor’s platform
The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor's follow-up of the maintenance of concrete structures and tension legs on the Heidrun TLP, between 5 and 9 December 2022.
Read moreDetails