Project’s environmental impact
The Port of Los Angeles and U.S. Army Corps of Engineers have prepared a Draft Environmental Impact Statement/Report (EIS/EIR) for the Yusen Terminals Inc. [YTI] Container Terminal Improvements Project, located at Berths 212-224 at the Port of Los Angeles, on the north side of Terminal Island along the Cerritos Channel, near the East Basin.
The proposed project entails improving Berths 214-216 wharves, increasing berth depth from -45 to -53 feet, and improving Berths 217-220 wharves to make way for 100-foot gauge gantry cranes, as well as deepening to a -47 feet berth depth. The project will also construct additional on-dock rail yard capacity for YTI.
The proposed project follows in the footsteps of the Port of Los Angeles’ $370 million Main Channel Deepening Project, done in conjunction with the U.S. Army Corps of Engineers. As a result of these improvements, the Port’s main channel and turning basins now provide -53 depths.
YTI is a wholly-owned subsidiary of Nippon Yusen Kabushiki Kaisha. YTI operates marine cargo terminals in Los Angeles and Oakland, providing stevedore and terminal service to container shipping lines. YTI has a long-term lease with the Port for operation of the terminal through 2016, and plans to exercise its option to extend its lease through 2026.
The Draft EIS/EIR includes a discussion of the proposed project’s environmental impacts and identifies mitigation measures to reduce these impacts as required under the California Environmental Quality Act (CEQA).
Source: Port of Los Angeles