A recent incident reported by CHIRP Maritime highlights the risks associated with improper maintenance and oversight of lifting points on tenders.
The lifting points were slightly deformed, which allowed water to access the bilge. With the bilge pump not working, additional water was added to the tender’s weight. The tender is stowed on the main deck approximately 2.5/3m from the water line.