IMCA provides lessons learned from two incidents regarding two dropped objects during a vessel dry-dock, both had serious injury potential.
Incident 1
During a thruster overhaul, the hold-back rigging for the steering pipe failed and the pipe subsequently dropped to the dry dock bottom directly below the vessel keel.
An original equipment manufacturer (OEM) was contracted to oversee the removal of a thruster pod lower gearbox, drive shaft, telescopic tube, and steering tube to allow the steering tube bearings to be removed.
The rigging was installed and managed by the shipyard. To assist in the freeing of the tube the OEM lead decided to slacken the chain blocks about 18cm to aid the release of the tube. The shipyard team was unaware of this adjustment.
The OEM lead gave the shipyard team instruction to release the tube which caused the tube to drop 18cm. The slack in the chain blocks enabled a shock loading on the chain blocks causing the tube to slip and fall 1.8 metres to the dock bottom.
Incident 2
A hydraulic cylinder clevis pin “cap” slid from the tower during workstation maintenance and fell 14 metres into the dry dock. A team of technicians were working to remove a hydraulic cylinder on the workstation of the vessel tower.
To remove the cap, seized to the cylinder pin by rust, one of them used a hammer; the cap bounced outwards and fell 40cm down onto a platform below.
Due to the tower angle of 36° the cap then slid towards an uncovered gap and fell to the dock bottom. A third-party work team were in the dock bottom near to where the dropped cap landed.
Probable cause
In both incidents, aspects of the work were not considered or assessed within Task Risk Assessments (TRA), Permit to Work and Tool-Box Talk discussions. There was insufficient consideration of:
- Changes occurring to the worksite;
- Crew working on different levels – this was not identified as presenting a DROPS risks;
- Third-party crew being allowed on the dock bottom without complete notification;
- Precautions specified in a permit to work not being followed;
- The OEM personnel were working beyond agreed authority levels.
The activities in both incidents were subject to Safety Management System interface between the shipyard and the OEM. The dry dock project team and vessel management team were following the Control of Work process to manage these interfaces and determine the required controls and supervision to manage several simultaneous operations (SIMOPS). This is a common aspect of shipyard/dry dock activities.
Lessons learned
- Ensure appropriately controlled safety barriers are maintained to provide adequate protection and prevent an incident;
- Ensure pre-job planning and risk assessment is robust enough, detailed enough and specific enough for the task in hand, and that sufficient familiarization time is allowed for those involved. Non-routine activities such as dry docks should be subject to greater focus on hazards and risks;
- Ensure and confirm that there are robust interface arrangements in place and understood between all the different parties in a dry dock or shipyard situation. This should include the yard, OEMs and third-party contractors, vessel management and project team;
- Ensure there are regular Control of Work meetings to communicate and control all activities at the site. These are a necessary and effective means to confirm the robustness and accuracy of the safety management system and ensure things are done safely;
- Ensure you know the procedures for the job you are doing. If you need to go through the procedure again with the team, take the time to do so. Check that everyone clearly understands their role and responsibility within the planned activity;
- Anyone in doubt should stop and take the time to think and talk it through with the team.