The Wheatstone Project successfully completed one of the largest offshore platform installations in Chevron’s history, marking a major project milestone.
Watch the journey of the Wheatstone topsides from fabrication to load-out, the sail-away, the arrival and the float-over onto the steel-gravity structure base.
The Wheatstone Platform is the largest offshore gas processing platform ever installed in Australia, with a topsides weight of about 37,000 metric tons and the largest float-over installation Chevron has ever delivered globally.
In the outbreak, I was open with you propecia before and after has changed my existence. It has become much more fun, and now I have to run. Just as it is improbable to sit.