MPA Singapore has produced a useful placard setting out the key steps in the quantity measuring procedure during a bunkering operations.
(please click on image for larger view)
During a bunkering operation, in addition to sample taking, chief engineers should follow the following key steps in measuring quantities:
- Inspect/gauge the non-cargo tanks and verify the cargo officer’s declaration before bunkering
- Verify the reference heights of the bunker tanker’s cargo oil tanks and check the measurement equipment, such as the sounding tape and thermometer
- Witness and confirm the opening tank gauging and cargo temperature readings of all cargo oil tanks
- Determine the trim and list of the bunker tanker
- Witness and confirm the closing tank gauging and cargo temperature readings of all cargo oil tanks
- Verify the delivered quantity in the bunker delivery note prepared by the cargo officer.
Further details may be found on relevant article
Bunkering operations in the Port of Singapore
In the onset, I was open with you propecia before and after has changed my existence. It has become much more fun, and now I have to run. Just as it is incredible to sit.