DNV GL has now launched a recommended practice (DNVGL-RP-C210) providing guidance on how to establish a sound basis for in-service inspection planning for fatigue cracks in marine structures.
DNVGL says that the guidance will save operational costs by using a risk-based approach to identify the ‘hot spots’ requiring inspection. The cost of inspections of marine structures such as jackets, semi-submersibles and floating production vessels can put a strain on already challenged operational budgets, driving the need to develop inspection programs only addressing critical areas.
“What we are commonly experiencing, is the use of inconsistent inspection planning methodologies, which can result in costly inspections at non-critial areas, or worse, no inspection at critical areas.”,” says Kjell Eriksson, Regional Manager for Norway in DNV GL – Oil & Gas.
“Fatigue crack can cause significant damage to offshore structures. The critiallity of fatigue cracks can vary, which combined with costly inspections programs drives the importance of developing accurate methods for identification of fatigue critical areas,” says Gudfinnur Sigurdsson, Technology Leader, Marine Structures, DNV GL – Oil & Gas.
“The use of risk based inspection planning for identification of critical aras for inspections will result in reduced inspection program and thereby a corresponding significant reduction in the inspection and operational costs.”
In-service inspection for fatigue is carried out to assure that possible cracks in the structure do not exceed a critical level. The outcome of in-service inspections can then be used to update the estimated fatigue reliability of the structure.
The RP includes guidance on:
- Fatigue analysis methods for jacket structures, semi-submersibles and floating production vessels (FPSOs)
- Effect of methodology/refinement used in fatigue analysis with respect to calculated fatigue life
- Basic distributions of parameters required for calculation of stochastic properties for load effects and capacity
- Derivation of target reliability level in relation to consequence of a fatigue failure
- Methodology for probabilistic analyses for planning inspection for fatigue cracks
Source & Image Credit : DNV GL