The US Department of Justice announced that an oil company has been sentenced for multiple felonies related to violations of offshore oil production safety and environmental regulation.
The U.S. Attorney’s Office for the Eastern District of Louisiana announced that ENERGY RESOURCE TECHNOLOGY GOM, LLC (ERT), was sentenced to three years of probation and ordered to pay a $4 million fine and $200,000 community service payment by U.S. District Judge Ivan L.R. Lemelle after having pled guilty to two felony counts of violating the Outer Continental Shelf Lands Act and two felony counts of violating the Clean Water Act related to conduct on its offshore oil production facilities in the Gulf of Mexico.
During the period of probation, ERT, its subsidiaries, agents and affiliated business entity Talos Energy Offshore, LLC, and employees thereof, will be required to comply with a Safety and Environmental Compliance Plan.
According to court documents, on or about November 26, 2012, ERT knowingly and willfully failed to comply with the regulations for hot work on its offshore production platform known as Ship Shoal 225. Specifically, contractors for ERT violated Title 30, Code of Federal Regulation, Section 250.113(c)(4), which mandates that welding and associated activities, also known as hot work, on offshore facilities shall not take place within 10 feet of a well bay unless production in that area is shut-in.
On or about November 27, 2012, on Ship Shoal 225, ERT knowingly and willfully failed to comply with the regulations for blowout preventer testing. A blowout preventer system is designed to ensure well control and prevent potential release of oil and gas and possible loss of well control. According to the Code of Federal Regulations, the blowout preventer system must be pressure tested at regular intervals, and the entire system must pass the pressure tests prior to resuming normal operations.
According to Title 30, Code of Federal Regulations 250.617, the results of the pressure testing, including any problems or irregularities observed during the testing and the actions taken to remedy the problems, must be recorded. The blowout preventer test record and pressure chart must be signed and dated by the onsite representative as correct. The blowout preventer pressure chart and operations log are required to be maintained on the platform and available for inspection by BSEE.
According to the pressure chart for the tests conducted by ERT’s contractors on November 27, 2012, only 6 of the 7 required components were tested. The chart showed pressure testing failures that required the workers on the platform to re-test the blowout preventer system. However, at the conclusion of the testing, the blowout preventer chart was not approved for accuracy by the ERT on-site representative on duty nor did the workers re-test the system.
Then, on or about November 29, 2012, inspectors with BSEE came onboard the platform at Ship Shoal 225 for a routine inspection and requested blowout preventer testing records. ERT could not produce an acceptable pressure test chart because of the deficiencies in the November 27, 2012 testing.
ERT also violated the Clean Water Act by tampering with the method of collecting the monthly overboard produced water discharge samples to be tested for oil and grease content pursuant to its NPDES permit. In Spring 2014, ERT became suspicious that contract operators were manipulating the integrity of the overboard produced water samples at some of its platforms by filtering the sample through coffee filters or other similar means to ensure that ERT would not be found to be in violation of its Permit.
Although the Discharge Monitoring Reports for the platforms from October 2012 through March 2014, showed that the platforms were not discharging oil and grease in excess of the permit requirements, when ERT began an investigation, the results of which it self-reported to the United States, and took the samples in accordance with the Permit requirements, multiple platforms were shown to be in violation of the monthly discharge allowances.
From April 2014 through June 2014, discharge monitoring samples correctly taken by ERT showed multiple Gulf of Mexico platforms, including High Island 557A, South Marsh Island 107A, Ship Shoal 225, Ship Shoal 224A, East Cameron 346A, Eugene Island 302C, South Timbalier 63A, Vermilion 331A and 171A, to be discharging oil and grease in excess of their monthly allowance under the Permit.
Source: US Department of Justice