This video depicts Taranto, the first offshore wind farm in the Mediterranean Sea, in the Italian Apulia region. The wind farm will be installed on monopile foundations in a water depth ranging from 3 to 18 metres.
Senvion has adapted its 3.0M122 onshore turbines to the particularly challenging offshore environment and developed an installation procedure suitable for the near shore wind farm.
[smlsubform prepend=”GET THE SAFETY4SEA IN YOUR INBOX!” showname=false emailtxt=”” emailholder=”Enter your email address” showsubmit=true submittxt=”Submit” jsthanks=false thankyou=”Thank you for subscribing to our mailing list”]
The company has also agreed to provide ten of its 3.0M122 turbines for the 30MW project.
The units will be installed in front of Taranto harbor in the Apulia region, in Southern Italy, on monopile foundations in water depths ranging from 3 to 18m.