Government of Canada has announced funding for the installation of shore power facilities for container vessels at two Port Metro Vancouver container terminals.
Shore power reduces emissions by allowing vessels to draw power from the local electrical grid and thereby turn off their diesel engines while in port. Also present for the announcement were partners BC Hydro, Global Container Terminals – operators of Deltaport terminals – and DP World Vancouver, operators of Vancouver’s Centerm.
Port Metro Vancouver was the first port in Canada to implement shore power for cruise ships, and since 2009, over 11,000 tonnes of greenhouse gas emissions have been avoided. The use of shore power at Port Metro Vancouver container terminals will further reduce greenhouse gas emissions, contribute to Canada’s emissions reduction targets, and assist Port Metro Vancouver in reaching targets under the Northwest Ports Clean Air Strategy, a collaboration between Port Metro Vancouver and the ports of Tacoma and Seattle, to reduce emissions in the shared Puget Sound – Georgia Basin airshed. Shore power will also ease the impacts of growing Canadian trade on communities by reducing generator noise associated with the auxiliary engines of container vessels while in port.
Quick Facts
- The total project funding is $12 million: $6 million from Transport Canada’s Shore Power Technology for Ports Program and $6 million from Port Metro Vancouver.
- $4.97 million ($2.485 million from Transport Canada, $2.485 million from Port Metro Vancouver) will be used to install shore power technology at a berth at Global Container Terminal’s Deltaport terminal in Delta, B.C.
- $7.3 million ($3.8 million from Port Metro Vancouver, $3.5 million from Transport Canada) will be used for the installation of shore power technology at a berth at DP World Vancouver’s Centerm Container terminal in Vancouver., and necessary upgrades on nearby BC Hydro property.
- Each ship connection to shore power is estimated to avoid greenhouse gas emissions of 75 tonnes.
- Both shore power operations are expected to be operational by March 31, 2017.
We are proud to be investing in shore power at Port Metro Vancouver’s Centerm and Deltaport container terminals. Federal initiatives such as the Shore Power Technology for Ports Program will not only help the environment and improve our health, but will also position British Columbia’s trade sectors to take advantage of growth opportunities, increase revenues and create jobs”, said the Honourable Kerry-Lynne Findlay, P.C., Q.C., Minister of National Revenue and Member of Parliament for Delta-Richmond East.
“Port Metro Vancouver is mandated to facilitate Canada’s trade while protecting the environment and supporting communities. The installation of shore power at container terminals in Vancouver and Delta represents another positive step in ongoing work to reduce marine shipping emissions, work that has resulted in significant improvements in Metro Vancouver air quality. We are very proud of the collaboration between the Government of Canada, Port Metro Vancouver, BC Hydro, DP World and Global Container Terminals to bring shore power facilities for container ships to our port”, said Robin Silvester, President and Chief Executive Officer, Port Metro Vancouver.
Source: Transport Canada
In the onset, I was explicit with you propecia before and after has changed my being. It has become much more fun, and now I have to run. Just as it is improbable to sit.