MSC Cruises today confirmed the order of two liquefied natural gas (LNG)-powered vessels with French ship builder Chantiers de l’Atlantique. This sees the two World Class options confirmed as firm orders with an option for a fifth ship. The two new ordered vessels – currently referred to as World Class 3 and 4 – will be delivered in 2026 and 2027.
MSC World Europa and MSC World America are already the most energy efficient ships in the industry performing significantly better than the International Maritime Organization (IMO) Energy Efficiency Design Index (EEDI) requirement, and the new ships will be an evolution of the state-of-the-art World Class prototype with innovative solutions to maximise the energy efficiency, with extensive use of heat recovery and other technological solutions, which will see the vessels having an even further reduced carbon footprint.
In addition, the new ships will be ready for a variety of alternative fuels including bio and synthetic methane and green methanol. The ships will also be fitted with the next generation dual fuel internal combustion engines with reduced methane slip.
Pierfrancesco Vago, Executive Chairman, MSC Cruises, said that the World Class is a truly innovative prototype and together we are building some of the most advanced ships in the world.
MSC Cruises, always seeking to reduce the environmental impact of its ships quickly and significantly, has accepted a significant cost premium to improve the energy efficiency of these new ships which, according to the IMO’s EEDI index, will emit 50% less CO2 than the IMO’s 2008 benchmark.
..Laurent Castaing, General Manager, Chantiers de l’Atlantique added.
As informed, the new World Class vessels will feature shore power plug-in connectivity to reduce carbon emissions in port, the most advanced wastewater treatment systems designed in line with the IMO, new advances in waste management, and a comprehensive range of onboard energy efficient equipment to optimise engine use and hotel energy needs to further reduce emissions.
The two new orders will be subject to access to financing, as per industry practice.