Maersk announced the construction of the company’s first low GHG emissions contract logistics warehouse in Denmark realised in partnership with Taulov Dry Port. The warehouse is part of Maersk’s strategy to accelerate the delivery of fulfilment capability in Denmark.
The green contract logistics warehouse is aiming to be built to BREEAM Excellent standards with zero direct emissions from operations in full accordance with Maersk´s overall goal to decarbonise its entire operations by 2040.
The 40.000 sqm facility has an option for an additional 40.000 sqm and is scheduled to become operational in 2024. It will be located in Taulov in South Denmark underpinning Maersk´s strong logistics footprint in Northern Europe and responding to rising market demands.
The typical customer needs in the fields of contract logistics are to support their inventory control, cost optimisation, extended visibility, speed to market and a consistent, sustainable flow of goods to reinforce their supply chain resilience
said Birna Odefors, Area Managing Director, Nordics, A.P. Moller – Maersk.
Advances in technology, new industry standards and increasing customer demand for sustainable supply chains have speeded up the project. All indoor and outdoor equipment in the warehouse will be electrified, solar panels will be installed on the entire roof of the warehouse and excess renewable energy produced will be fed to the grid. Battery driven trucks will be used for all of the shunting operations and hydrogen stations are planned within 150 metres from site.
The warehouse has a zero emissions approach to both direct and indirect aspects of the operations.