A recent IMCA Safety Flash focuses on an incident in which, a knuckle boom stopper pad fell to the main deck directly below the knuckle boom, to provide lessons learned.
The incident
No personnel were injured, however there was potential for serious or fatal injury. The incident occurred when a crane operator started moving the crane boom in prepration for use. Once the crane was clear of all obstructions the crane operator started slewing it outboard. The rigging supervisor acting as banksman was in attendance, located on the inboard dedicated walkway. As the crane boom was slewing, the crane operator saw the boom stopper sliding down the knuckle boom and then falling to the deck. The crane operator immediately sounded the crane horn. The boom stopper weighed 15.5kg and fell 35m. There were no personnel near where it dropped/landed.
Investigation
- The area where the knuckle boom stopper pad landed was not a restricted area, access up and down the deck was via a dedicated walkway, inboard of the boom, 5m away from where the boom stopper landed;
- The knuckle boom stopper pad was only attached to the backing plate by adhesive and then the backing plate bolted to the boom stopper frame structure.
Actions taken
- Vessel technicians modified the backing plate by securing the boom stopper pad with 8 x M16 countersunk cap screws, Loctite and centre dab, and then it was reinstalled by a rope access team. The metal backing plate was secured with M20 bolts using nyloc and Loctite, preventing any repeat of the boom stopper becoming detached.
- There is potential for similar incidents to happen on other vessels, in areas where access to potential dropped objects is difficult. Check and see:
- If any other cranes use the same or similar type pads and if so, ensure alternative or additional fixings are applied to any connections solely reliant on adhesive compound bonding;
- Identify equipment and structures that present a risk of dropped objects and cannot be easily accessed for inspection and determine the best means of safe access and an appropriate frequency of inspection;
- Verify if there is an existing work order or dropped object check list to cover these items and add/update as necessary.