Costa Smeralda’s construction is continuing at the Meyer shipyard in Turku, Finland. The cruise ship belongs to Costa Cruise’s fleet and it’s the the first cruise ship for the world market, specifically in Europe, to be fuelled, both in port and while at sea, by liquefied natural gas (LNG).
The Panama-flagged Costa Smeralda debut is scheduled for October 20, 2019, with a 15-day inaugural cruise from Hamburg to Savona. The naming ceremony will take place in Savona on November 3, 2019.
Specifically, the yellow funnel with the blue C, has been installed, according to Carnival Corporation, the parent company of Italy-based Costa Cruises.
[smlsubform prepend=”GET THE SAFETY4SEA IN YOUR INBOX!” showname=false emailtxt=”” emailholder=”Enter your email address” showsubmit=true submittxt=”Submit” jsthanks=false thankyou=”Thank you for subscribing to our mailing list”]
In addition, the cruise ship is an environmental transformation that aims to enhance the air quality as LNG almost prevents particulate and sulphur oxide emissions at sea and in port. It also reduces emissions of nitrogen oxides and CO2.
With a gross tonnage of over 180,000 tons and a capacity for 6,600 passengers, Costa Smeralda is planned to be in force in October 2019.
The newbuild will feature a length of 337 meters and a width of 42 meters.
Delivery of a second ship, the twin to Costa Smeralda, also being built by Meyer-Turku, is planned for 2021.
Costa Smeralda and its twin ship are part of an expansion plan for the Costa Group fleet under which seven new ships will be delivered by 2023, for a total investment of over 6 billion euros.
On November 4, 2019, a 6-day inaugural cruise will depart from Savona for Barcelona, Marseilles and Civitavecchia. Costa Smeralda will then continue to sail in the Western Mediterranean until April 2021, according to the company.